Different jurisdictions.
One system.

The Service Contractor's Hub

Built for work, not paperwork.

Now in closed beta for TSBC permits.

"No work begins without a permit."

— Every Inspector I've ever met.

Contractor Pain Points

Permit admin slows down billable work.

Repeated data entry

Contractor, FSR, site, and scope details get typed again and again.

Portal friction

Permit pages have required fields, validations, and review steps that slow the day down.

Submission risk

Wrong job type, missing scope, or bad load values can send a contractor back through the form.

How It Works

A permit process contractors still control.

01

Build the permit record

Enter the job, site, contractor, FSR, value, and load details before opening the portal.

02

Open TSBC

Use your own TSBC login. PermitsForSubs does not store portal credentials.

03

Fill current page

TSBC Assist fills supported pages only when you click.

04

Review and submit

Contractors review TSBC Preview and submit manually only when ready.

Frequently Used Job Types

Focused on the jobs contractors pull often.

EV Level 2 EV Off / Not Applicable HP/AC Wiring Solar PV Service Work Residential Electrical

Closed Beta

For a small group of BC electrical contractors.

The TSBC adapter has completed Beta 1 certification through Preview for core scenarios. The next step is controlled use by trusted contractors with real portal accounts.

Beta boundaries

  • No automatic submission
  • Your own TSBC login
  • Manual Preview review required
  • Chrome extension installed separately
  • Built for the BC closed beta at bc.permitsforsubs.ca

Contact

Contact

Have a question about PermitsForSubs or the closed beta?

Send a note with your company name, service area, and the permit types you handle most often.